daltonjohnson92 daltonjohnson92
  • 09-12-2017
  • Mathematics
contestada

A bill from a plumber was $306 The plumber charged $150 for parts and $52 per hour for labor. How long did ths plumber work at his job?

Respuesta :

shawnkat
shawnkat shawnkat
  • 09-12-2017
We can make an equation from this.
Our intial value is 150 for parts, and he works for 52 dollars an hour.
We can define h for hours and c for total cost.
Therefore, we have:
c = 150 + 52h.
We can set this equal to 306 dollars, as that's the given total cost:
306 = 150 + 52h
Subtract 150 from both sides:
52h = 156
Divide both sides by 2:
h = 3
He worked 3 hours.
hope this helped!

Answer Link

Otras preguntas

which is bigger, 7/8 or 9/10
What is the charge of CO3?
Sharon is thinking of a number. It is an even number between 300 and 400. It is divisible by 5 and also by 9. what number is Sharon thinking of?
What is an acrostic poem for the word triangle
write a real world problem using ratios or rates that could be represented in the coordinate plane
The sum of interior angles of a regular polygon is 1980 degrees. How many sides does the polygon have?
What does it mean to rebut something? a. to strike with enough force to break an object b. to oppose using evidence or an argument c. to use an aggressive and i
What term refers to the average kinetic energy of the particles from a just baked cookie
What is the major atom in methane that contributes to climate change
what is the pressure inside arteries when ventricles contract?