thomisonariel306 thomisonariel306
  • 06-11-2017
  • Health
contestada

Asking potential dating partners for a date is most likely to be reinforced on a ________ schedule.

Respuesta :

andriansp andriansp
  • 20-11-2017
the answer to this question is variable-ratio schedule
variable-ratio schedule refers to a schedule of reinforcement in which the response is being reinforced. after an unperdictable amount of response is being made.
The purpose of this type of scheduling is to create a high rate of responses.

Answer Link

Otras preguntas

In the rectangle below...
a case-control study can examine only a single outcome or a limited set of outcomes. O TRUEO FALSE
In addition to comparing qualified Associates for key carrier certification, what are the GM responsibilities for initiating the process and after a candidate p
A light ray travels in two media A and B will speeds 2×10⁸m/s and 2.4×10⁸m/s. The critical angle between them isA.sin⁻¹(8/9)B.sin⁻¹(5/6)C.tan⁻¹(5/6)D.cos⁻¹(8/9)
The main component of semen is sperm.O TrueO False
What is treatment introperatively for hemophilia A patients?
Find any horizontal asymptotes fory = (x²+x-6)/(x²-4).
*An electric bulb used in your house rated 100 W and a refrigerator rated 400 W. If these appliances are operated for 10 hours per day, what is the cost of the
All of the following concepts guided the creation of the Texas Constitution of 1876, EXCEPTa. Popular Sovereigntyb. Limited Governmentc. Self-governmentd. Capit
Find the equation of the line that passes through (4, 7) and with slope 5. Then write the equation in slope-intercept form.​