kofistitt kofistitt
  • 09-10-2017
  • Mathematics
contestada

If 6 men can do a piece of work in 14 days, how many men are needed to do the work in 21 days?

Respuesta :

Stochastic
Stochastic Stochastic
  • 09-10-2017
Nine men are needed.
hope this helps
Answer Link
SchoolNerd1947
SchoolNerd1947 SchoolNerd1947
  • 09-10-2017
The answer should be 9 workers due to 7 day periods.

21/7 =3
3+6 =9

Answer:9
Answer Link

Otras preguntas

The Battle of Vicksburg was significant because -the North could not access its railroads after its defeat. -the South lost control of the Mississippi River. -U
Even if they were not necessarily abolitionists, why might people in New Mexico vote against allowing slavery in their state?
What countries and regions became part of the Persian Empire?
What is the distance between the points (10, –7) and (10, 9) on the coordinate plane?
What two documents Does Martin lugger Luther king Jr. Refer ta as "a promissory note to which every American was to fall heir "?
Which of the following did NOT occur as a result of the Neolithic agricultural revolution?
how do you solve x-y=11 2x+y=19
1. Which economic term means there is a period of slow economic growth with high unemployment? export market inflation recession emerging market
In which one of the following sentences is a word misspelled? A. Laticia weighed herself on the bathroom scale. B. Niether Lois nor Clark believed in Superman.
Which area was never conquered by the Persians, even at the height of their empire? A. Greece B. Egypt C. Babylonia D. retriceria