katiekern3233 katiekern3233
  • 09-09-2017
  • Social Studies
contestada

What do the letters in the acronym downtime refer to lean methodology?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 22-09-2017
The acronym DOWNTIME referring to LEAN methodology stands for Defects, Overproduction, Waiting, Non-utilized Resources/Talent, Transportation, Inventory excess, Motion waste and Excess processing. DOWNTIME is a way of remembering easily the 8 wastes in a manufacturing. It is one of numerous acronyms for relating the 7 or 8 wastes in LEAN methodology.



Answer Link

Otras preguntas

There are 12 boys and 20 students. What is the ratio of girls to boys​
Which statement explains the type of friction acting on each object? The bike has rolling friction, the sled and the motorcycle have sliding friction, and the
Charlemagne became the ruler of Europe by what? the sword and the cross. bribing neighboring tribes with money. killing all other heirs to his throne.
Please help me with this, so confusing
Which statement is true regarding the Treaty of Versailles? A. It did not financially punish Germany. B. It did not force Germany to disarm. C. It was not
Student follow up 1 The ionic equation for the reaction between zinc and sulfuric acid is: Zn(s) + 2H+ (aq) - Zn?"(aq) + H2(g) a State what has been oxidised in
Find the slope of the line.
Match each situation with a diagram
Ring Company makes telephones. Currently, Ring makes all components of the telephones in-house. An outside company has offered to supply one component, part num
help! i need the answer asap!!