srobsher8 srobsher8
  • 07-06-2015
  • Mathematics
contestada

4 people can stain a deck in 2 days, how many people would be required to stain the deck in only 1 day?

Respuesta :

Curti
Curti Curti
  • 07-06-2015
4 people can stain a deck in 2 days but 8 people can stain it half the time
Therefore 8 people can stain the deck in a day
Answer Link
zkrnach14 zkrnach14
  • 07-06-2015
8 people would be required to stain a deck in one day
Answer Link

Otras preguntas

What is an escapement?
a solid right triangle pyramid has a regular hexagonal base with an area of 5.2 cm^2 and height of h cn. Which expression represents the volume of the pyr
the volume of a cylinder is 54 Pi centimeters to the third if the radius is 3 cm what is the height of the cylinder
How did shifting government policy contribute to both of the 1920s bust of 1929
Given tan(A) = 2 and A is in Quadrant I, find sin(2A) and find cos(2A). 0 1 1/2 4/5 0 1 1/2 -3/5
A cube of each of length 3m is subjected to a normal force of 36N. What will be the stress on cube a)12. Ab)2 c)18. d)4
Plzzz help m ASAP because I need help
A pentagonal (five-sided) sign tells you there is a school nearby.
How many pieces of 1/3 can u get from 7/8
a can of soup has a diameter of 7 centimeters and a height of 11 cm assuming that a can is full what is the volume of soup contained in the can is 3.14 and run