jaxonburwick50 jaxonburwick50
  • 08-02-2022
  • Mathematics
contestada







How long will it take 4 workers to complete a task, given that it takes 10 days for 6 workers to complete the same task?

Respuesta :

lovecamdenn83
lovecamdenn83 lovecamdenn83
  • 08-02-2022

Answer:

12 i think

Step-by-step explanation:

Answer Link
irisraya1
irisraya1 irisraya1
  • 08-02-2022

Answer: it will take 8 days for 4 workers

Answer Link

Otras preguntas

what is the incorrect pronoun.explain my dog chased their tail
HELP PLS Convert 0.0000001 to a power of 10. 107 10−7 106 10−6
For each triangle, find the values of the variables
To serve 1 person at a local restaurant it takes 10 minutes to serve 5 people it takes 18 minutes what is the point slope form
Represent the following expressions as a power of the number a (a≠0): (a^3*a/a^2)^-1
An art exhibit at a local museum features several similarly shaped metal cubes welded together to make a sculpture. The smallest cube has a edge length of 6 inc
What is the sunna ? A. Another word for the Qur’an B. The Muslim legal system C. The record of Muhammad’s behavior and teachings D. The Islamic calendar
potential energy matter has a result of its ____ or ____.
Raman buys two packages of chicken. One package weighs 1.5 pounds and the other weighs 3.4 pounds. The chicken cost 3.25 per pound. What is the total price?
Gemma and Leah are both jewelry maker Gemma 106 beaded necklaces Leah made 39 more necklaces then Gemma