mykelrose1 mykelrose1
  • 11-01-2017
  • Mathematics
contestada

A building company completes 42 homes every 2 months. At this rate, how many homes can the company complete in 6 months?

A:63
B:126
C:252
D:504

Respuesta :

auroramt13
auroramt13 auroramt13
  • 11-01-2017
B. Because 42 houses for every 2 months so 84 houses for every 4 months and then 126 houses for every 6 months
Answer Link
sydielimchong
sydielimchong sydielimchong
  • 11-01-2017
the answer is B. 126
Answer Link

Otras preguntas

solve the following equation: 7/8 = -7
what is 2x+4y=8 as a slope
5(x-1)=23 solve the equation
write a quadratic polynomial, sum of whose zeroes is 2 and product is -8​
In the last stanza of the poem, Tempest acknowledges some negative associations that people have with Shakespeare. What examples does she give to refute (dispro
Evaluate the function if x=-3 f(x) =1/2x-1 A. -2.5 B. 0.5 C. -4 D. -1
What were some important ideas that came to Christianity through Judaism?
can you pls help me with math: 85+6÷6= ​
Instrucciones: Usa las palabras de vocabulario para describir una ciudad medieval. Menciona la calidad de vida, los edificios, etc. Necesitas escribir 4 oracion
What have you realized?​