A construction project is scheduled to take a total of 480 days .The building will be 40 level high .5 levels were completed in 95 days.

Respuesta :

2037418
2037418 2037418
  • 06-10-2021

Answer:

?????

Explanation:

whats the question

Answer Link

Otras preguntas

What is the main task of "the full House or full Senate when a bill arrives at the floor
What are three countries that became communist following World War II? Portugal Finland Hungary Bulgaria Soviet Union Poland
Which of the following statements about Mao Zedong is true? Mao used guerilla tactics. Mao adopted the philosophy of Communism. Mao led the Red Army on a year-l
what is archeology ?
Two cards are drawn from a standard deck. What is the probability that both are aces or both are face cards?
Indentify the slope of the parallel line to the equation: y = 3/5x + 13
고체와 액체 사이의 회색 영역에서는 어떤 일이 발생합니까?[Translated]What happens in the gray area between solids and liquids?​
Which expression can be written as 2x(4+9)? A. 2x9+4 B. 2x4+9 C. (2x9)+(2x9) D. (2+4)+(2+9)
Come someone please help me, its just some art questions but I have no idea what these things are, please help!
Directions: You have just read an excerpt from Theodore Roosevelt’s “A Letter on Conservation” in class. Write a well-developed response that explains what Roos