contestada

45 laboures can repair a road in 24 days .how many labourers should be added to repair the road in 20 days​

Respuesta :

niroulaanita549
niroulaanita549 niroulaanita549
  • 10-08-2021

Answer:

here's your answer .Hope you will understand it.

Ver imagen niroulaanita549
Answer Link
abriellegonzalez6
abriellegonzalez6 abriellegonzalez6
  • 02-07-2022

Answer:

9

Step-by-step explanation:

hope it will help good day.

Ver imagen abriellegonzalez6
Answer Link

Otras preguntas

If the following data were transformed, and points with the coordinates (x,log (y)) were plotted, what points would be plotted? Round log(y) to three decimal pl
Calculate and record the current values in Table 1. Using these results, plot the forward-biased portion of the I-V characteristic of the diode. Also calculate
AUDIO SPEED 11. A chemist mixed two samples together: a gray liquid that boils at 103°C and a colorless gas that boils at 19°C. She analyzed the results and fou
In the selection, a Legacy of stone, what does the organizational structure of the section inspiration help the author emphasize
Write an assembly program designed to copy the value 0x55 to data memory locations 0x40∼0x45 through direct addressing modeHow would the program change if the d
Solve for q in terms of r,s,t, and u. tu=rsq
Musical texture refers primarily to what quality in music?
how do I get good at ELA, because I am very bad at it!!!!!!!!!!
What is the difference between a happy person and an enthusiastic person?
Draw a Punnett square and find the F2 ratio (phenotype and genotype) if a hybrid tall plant (Tt) is crossed with a pure dwarf plant (tt): a) 1:1 (Tt), 1:1 (tt)