jacobnewcomb jacobnewcomb
  • 10-03-2021
  • Mathematics
contestada

A building company completes 42 homes every 2 months.

At this rate, how many homes can the company complete in 6 months?

Respuesta :

gia23760
gia23760 gia23760
  • 10-03-2021

Answer:

126

Step-by-step explanation:

if they can do 42 houses in 2 months we need to find out how many houses they can complete in 1 month

[tex]42 / 2 = 21[/tex]

so they can build 21 houses in 1 month and we need to find out how many they can build in 6 months

[tex]21*6 = 126[/tex]

they can complete 126 homes in 6 months

Answer Link

Otras preguntas

One of the major disadvantages of a sole proprietorship is
What holds the two strands of a DNA molecule to each other?
Does anyone know the answer???
A car is traveling down the highway at speed v when the driver slams on the brakes and skids to a stop in a distance d. Assuming the same frictional force, how
The pharmacist uses 67mg, 100g and 0.6 kg of drug to compound 3 separate precription. how much total drug did the pharmacist use in grams?
what is the importance of the Mahabharata to indian culture and world culture
What can the legislative branch do if the president vetoes a bill
Which graph has a rate of change of zero?
Consider the function y=4e^3x-2 . (a) What is its domain? What is the range? (b) Find the intercepts on the two axes if they exist. (c) Sketch the graph of the
An AC voltage of the form Δv = 100 sin 1 000t, where Δv is in volts and t is in seconds, is applied to a series RLC circuit. Assume the resistance is 415 Ω, the