What is the quantity of work done when a crane lifts a 100-N block from 2 m above the ground to 6 m above the ground?

A. 100 J
B. 200 J
C. 400 J
D. 600 J

Respuesta :

The correct answer would be

C. 400 J

Answer:

400j

Step-by-step explanation: