engineeringplus engineeringplus
  • 10-07-2020
  • Business
contestada

Project A has cash flows of $4000, $3000,&0 and $3000 for years 1 to 4 and project B has cash flows $2000,$3000,2000,$3000 for years 1 to 4

Respuesta :

queenkeyara15
queenkeyara15 queenkeyara15
  • 10-07-2020

Answer:

Project X has both a higher present and a higher future value than Project Y.

Explanation:

Hope this helps :)

Answer Link

Otras preguntas

A line intersects the points(-22,-14) and (-18,-12). What is the slope-intercept equation for this line?
A bag has 2 blue marbles, 3 red marbles, and 5 white marbles. Which events have a probability greater than 1/5? Select theee options
-13 = v over 10 minus 12
According to the map, which would be the BEST location to build a geothermal electrical generator?
Who was the first president
When ice wedging causes a rock to crack in half, it is an example of *
Popcorn kernels pop independently (i.e. unimolecularly). For one brand at constant temperature, 5 kernels pop in 10 seconds when 180 kernels are present. After
How did the United States change the Japanese government after World War II?
Psychological tests show that 18-year-old Isaiah has an intelligence score of 65. Nevertheless, Isaiah can, with a few seconds of mental calculation, accurately
Evidence for evolution reveals that closely related organisms have many _____ characteristics.