elizabethremilekun0
elizabethremilekun0 elizabethremilekun0
  • 10-06-2020
  • Mathematics
contestada

if 6 men finish a particular work in 4 days, how many days will it take 8 men if they are working at the same rate​

Respuesta :

gami1234
gami1234 gami1234
  • 10-06-2020

Answer:

no days

Step-by-step explanation:

Because, The first 6 mens are finish that work. Therefore, the other 8 men nothing to do.

Answer Link

Otras preguntas

All multicellular organisms benefit from the organization of __________ into tissues, organs, and organ systems.
What are three functions of proteins?
Adam had silly putty 4 5/6 inches long. If he stretched it 2 2/3 times it's current length how long would it be?
Bruce bought two books. One book cost $4.00 more than three times the other. Toghter, the two books cost him 72
what steps did mexico government take to change the economy starting in the 1990
An art dealer makes a 17.5% commission on every painting sold. If a painting sold for 1,500, wjhat was the commission
Which is a sentence fragment? A. Katie was glad she came riding with us. B. The horse I rode was chestnut brown, and hers was gray. C. If the barn door was open
Give specific examples of colonial responses to english policies.
what is 25/100 in simplest form
is it true that an existing community is gradually replaced by another community in an ecological succession