When a contractor is under a contractual duty to construct a building and the building is destroyed by an act of nature while it is still a work in progress, the destruction __________.

Respuesta :

imustapha180
imustapha180 imustapha180
  • 08-02-2020

Answer: the destruction will not discharge the contractor's duty to perform, but will extend the date of performance

Answer Link

Otras preguntas

what is the name for all physical material in the universe
Chelsea invested $15,000 at 4% interest compounded annually. How much interest will she earn in 4 years?
can anyone help me please.
Quadrilateral LMNO has diagonals that intersect at point P. If , LP = 6x – 5, and NP = 4x + 17, find the length of / such that LMNO is a parallelogram.
Which would increase the reaction rate? A) decreasing the reaction temperature B) decreasing the reactant's particle size C) decreasing a reactant's concentr
can someone please help me with this please.
The establishment of colonies and then cities in the New World eventually led to the desire for A. self-governance and independence. B. British goods. C. fas
a geometric sequence is defined recursively by an = 20an-1. the first term of the sequence is 0.01. which of the following is the explicit formula for the nth t
what polynomial identity should be used to prove that 252 = (20 5)2?
In a​ region, there is a 0.7 probability chance that a randomly selected person of the population has brown eyes. Assume 12 people are randomly selected