jyllianbarry3907 jyllianbarry3907
  • 10-01-2020
  • Business
contestada

A creditor must ensure that the consumer receives the revised Loan Estimate no later than four business days prior to:________.

Respuesta :

esanolakunle15
esanolakunle15 esanolakunle15
  • 10-01-2020

Answer:

Consummation

Explanation:

A creditor must ensure that the consumer receives the revised Loan Estimate no later than four business days prior to consummation.

Answer Link

Otras preguntas

PART B How can the stage manager use the constant of proportionality to find the dimensions of any new props the director requires?
15. Write the factored form of 9+24 by pulling out the GCF?*
Which of the following phrases describes the similarities between problem space theory and how the brain looks at problems
Prior to Christine day’s arrival. What was the culture or Lululemon? Help me fast!
kelper fine-tuned Copernicus heliocentric model by
A cartographer graphed the locations of a light house and all of the islands in the vicinity. He positioned the light house at (-7,9) and the farthest island at
Tartaric acid, shown below, is a covalent compound with high water solubility. Despite the absence of ionic bonds in the compound, aqueous solutions of tartaric
One mole of monatomic perfect gas initially at 500 K and 1000 cm³ expands to a volume of 2000 cm³. If the expansion is isothermal and reversible, (a) Find q and
A 32.0 kg crate is initially moving with a velocity that has magnitude 3.58 m/s in a direction 37.0 ∘ west of north. How much work must be done on the crate to
can somebody help me with this please please pleaseeeee thanks :)