Leua
Leua Leua
  • 08-06-2019
  • Mathematics
contestada

A 12 mile stretch of highway needs repairs. The work crew can repair 3/4 of a mile per day. How many days will it take to repair the damaged stretch of highway.

A 12 mile stretch of highway needs repairs The work crew can repair 34 of a mile per day How many days will it take to repair the damaged stretch of highway class=

Respuesta :

carlaedwards50ouwijf carlaedwards50ouwijf
  • 08-06-2019

Answer:

16 days

Step-by-step explanation:

  1. 12÷3/4
  2. 12/1÷3/4
  3. 12/1×4/3
  4. 4/1×4/1
  5. 16/1
  6. 16÷1
  7. 16
Answer Link

Otras preguntas

ziggurats were built in the city states of sumer as
8x – 2(x + 1) = 2(3x – 1) 0 2 no solution identity this is for algebra 1 plz help
What is 2/3 of 24 bananas
$15 lunch; 20% tip what's your total please help
5 pizza cost $60. What will 9 cost
What is 0.0000000734 estimated as the product of a single digit and a power of 10? ______*10^-------
The narrator of "Uncle John's Farm" is _____.
Which group of immigrants arriving by boat was processed at Ellis Island in the 1880s? -all passengers -first-class and second-class passengers -only steerage-c
a) write a relation for perimeter of a square with side length n centimetres
What is 45 1/2% as a fraction in simplest form?