Maisie2810
Maisie2810 Maisie2810
  • 07-05-2019
  • Mathematics
contestada

How do you do this??? Answer???

How do you do this Answer class=

Respuesta :

JamieLynne
JamieLynne JamieLynne
  • 07-05-2019

Answer:

4 workers x 1 hour = 4 work hours

4 work hours/3 workers = 4/3

(4/3) x 60 minutes = 80 minutes

Answer it will take three workers approximately 80 minutes to trim a hedge.

Step-by-step explanation:

Answer Link

Otras preguntas

Suppose the population of a town is 15,200 and is growing 2% each year. Write an equation to model the population growth. Predict the population after 10 years
how was a squire welcomed into the order of knights
What are the powers of 3 in the range of 3 to 1,000?
The ratio of the radii of two circles is 4:9. What is the ratio of their circumferences?
Behavioral Adaptations: Behavior that animals begin life with that helps them meet their needs is called ________.
(2x^2-17x-38)/(2x+3)
How to write an answer to 3 significant figures
When water evaporates at constant pressure, the sign of the change in enthalpy A. is negative. B. is positive. C. depends on the temperature. D. depends on the
ISSUING driver's licenses is the responsibility of which level of  government
why is justinian important