brianna13202012 brianna13202012
  • 06-11-2018
  • Mathematics
contestada

10 people can paint a building in 5 days. If each person moves as quickly as others then how much of a building can 7 people paint in 5 days

Respuesta :

Liebesleid
Liebesleid Liebesleid
  • 10-11-2018

The entire job is 10*5 = 50

7 people in 5 days will do 7 * 5. That is 35.

So, it is 35/50 = 7/10 = 0.7 of the job or 70%.

Does this make sense?

Answer Link

Otras preguntas

That knife couldn't cut hot butter
the sum of twice a number and 17 less than the number is the same as the difference between-37 and the number. what is the number?
1,672 divided by p=209 p=?
Square is 19 yd.² what is the length of each side
What is the mass percent of aluminum in Al(OH)3 the molar mass of AL = 26.98, H = 1.0079, and O = 16.00
Which element forms steel when added to carbon?
A student forms the following hypothesis. if people eat white chocolate, then they will be happier . Describe TWO problems with this hypothesis. PLEASE HELP
what is the dependent variable
An equation for m=-1,b=3
Which of the following sparked the Sand Creek Massacre? A. Sioux indian attacks on stagecoach lines B. failure of the Fort Laramie Treaty C. Indian interest in