Shutupvitxh6220 Shutupvitxh6220
  • 10-04-2024
  • Business
contestada

P and Q working together can complete a job in 48 days. The ratio of their rates of doing work is 3:5. Find the time taken by the faster person to complete the job. (in days).

Respuesta :

Otras preguntas

What is rhyme scheme? A. the repetition of identical sounds in the last syllables of words B. the pattern created by stressed and unstressed syllables of wo
What is the length of AB with endpoints A(1, 0) and B(4, 3)?
How was the Atlantic slave trade beneficial for merchants in Europe?
Diatomic molecules will be ______ when they are composed of only one element. Nonpolar Polar
Both sound and light waves travel through matter, but only light waves travel through A. a vacuum. B. liquids. C. fire.
How many terms are in the expression a3 + 3a2b - 4ab - 11b + 7?
What does cóma està mean?
five different institutional source of contracts
Find the center of the circle that can be circumscribed about mc043-1.jpgEFG with E(6, 4), F(6, 2), and G(10, 2)
Ana bought a van that holds 20.75