Starbucks2035 Starbucks2035
  • 07-02-2024
  • Mathematics
contestada

A can do a piece of work in 14 days and B in 21 days. They begin together, but 3 days before the completion of the work, A leaves off. In how many days is the work complete?
a. 10 days
b. 10 1/5days
c. 15 days
d. 7 days

Respuesta :

Otras preguntas

Pat is biologically a female but doesn't feel like one. Although her parents enrolled her in dance lessons and she tried wearing makeup and dresses she can't fi
What is the cheapest you can buy a sugar glider and where
which can be used to find the distance between points at (-5,-12) and (-5,14)?
why are the planet important
a website where a writer or group of writers shares their own experiences and opinions is that
Exposing inner mitochondrial membranes to ultrasonic vibrations will disrupt the membranes. However, the fragments will reseal "inside out." These little vesicl
1 quart is how many pints
Why don’t water and oil mix when the two liquids are poured into the same container?
I don't understand can someone explain to me please
Here are some numbers 9.6 12.6. 15.4. 7.6. 12.4. 17.4 Write the numbers in pairs so that the sum of the numbers in each pair is the same.