rekocrebun541 rekocrebun541
  • 11-01-2024
  • Mathematics
contestada

Define random variables x1, x2, x3, x4 representing the time needed to complete four steps of a project, each with independent gamma distributions (common theta = 2, alpha1 = 3).

Respuesta :

Otras preguntas

Working your body harder than usual in order to improve how it functions is formally referred to as progression specificity overload reversibility
which does the word part inter - mean in the word interject? to throw not between
A computer simulation tossed a 10-faced die 5 times How many possible outcomes exist? 9,765,625 100,000 252 100
A car travels 70 miles in 80 minutes. Which is its average speed per minute
Ted Kennedy championed various causes an increase in the minimum wage, health care reform, and immigration reform. WHAT WOULD BE THE CORRECT PUNTCTUATION
Which development in 1862 led to rapid settlement of the Great Plains?
A blue puck has a velocity of 3i –4j m/s. Its mass is 20 kg. What is its momentum?
Which word identifies the tone of Kennedy’s inaugural speech best
What is the effect of molecule size on a molecule’s ability to diffuse across a semipermeable membrane?
According to the general equation for conditional probability, if P(A^B)=3/4 and P(B)=4/5, what is P(A B)?