After a re-evaluation of the duration of activity B, it has been provided the following data. Most likely duration = 10 Optimistic Duration = 16 Pessimistic Duration = 25 Using the three-point estimating technique the new duration of activity B is a. 7 b. 15 c. 17 d. 22

Respuesta :

Otras preguntas

A physicist wants to examine the characteristics of the new material the physicist will most likely do so by what method? A survey a group of people B perform
Find the radius of a circle with an area of 90 cm^2
Why did Theodore Roosevelt want William Taft to succeed him as president?
The Mesoamerican leader Pakal the Great was the emperor of the Aztec people. the king of a Maya city-state. the head of the Inca religion. the ruler of a Zapote
Before reaching the higher levels of Maslow's hierarchy, one must __________. A. rise above daily problems by improving one's emotional health B. build a stron
Match Term Definition Line Segment A) a series of points that extend in two directions without end
How do you round $0.24 to the nearest cent?
y times 6 for y = 2/3
What is the value of f(0)
Solve the inequality. y – 5 ≥ 11