jahfarisamuel6655 jahfarisamuel6655
  • 06-06-2023
  • Engineering
contestada

2) If for a proposed urban freeway, the design ESAL is 7.11 x10° and the CBR of the subgrade layer is 80, determine the depth of a full-depth HMAC layer (one HMAC layer on subgrade) using AASHTO method. Assume Exc=300,000 lb/in2, R-90%, and So=0.45

Respuesta :

Otras preguntas

How do you say 'thank you' in french?
A company in its first year of business produced 1,200 brochures for a total cost of $5,050. The following year, the company produced 500 brochures at a cost of
The following statements are made about some number: a) It is prime b) It is odd number and less than 5 c) It is an even number d) It is 3 Find this number
What is the solution to 3/4(x + 8) > 1/2(2x + 10)? A (–∞, –4) B (–4, ∞) C (–∞, 4) D (4, ∞)
Order the numbers from least to greatest
Which of the following is not an example of absolute chronology? A. a timeline B. a sequence C. a calendar D. an investigation
Whats a skilled craftsperson called?
I Will give 20 points. A photographer is planning a group picture of all the students at a middle school. She wants to keep each homeroom class together and ar
Number 21-23 answer all for 25 points
What is the range of f(x) = 3^x + 9?